From signed capacity to accepted, workload-ready clusters.

We lead AI cluster delivery for operators in Australia, from first design review to production workloads.

Arrange an introduction

What our deployment leads have delivered

hyperscale AI infrastructure delivered
$1.5B+
sites led
6
generations of ML chips deployed
4

01 / THE PROBLEM

Most delays happen between contract and go-live.

1.1

Fabric faults surface late, after racks are powered and workloads are waiting.

1.2

Burn-in drags on for weeks while failures are traced one node at a time.

1.3

Milestones slip against the financing schedule.

1.4

Many vendors are on site. No one owns the whole build.

02 / SERVICES

Hand us the part of the build that is slipping, or all of it.

  1. 01

    Commissioning & Startup

    From powered racks to accepted capacity. Fabric bring-up, burn-in, acceptance and handover.

  2. 02

    Project Management

    One accountable lead across every vendor, from signed capacity to production live.

  3. 03

    Project Controls

    Schedule, cost and risk measured at rack and fabric level, reported in a form your lender can use.

  4. 04

    Staffing

    Experienced cluster delivery people placed inside your team, from one specialist to a full crew.

03 / DELIVERY

The path we lead, in five phases.

CAPACITY SIGNED 01 Readiness and design validationM1 · DESIGN FREEZE Validated design 02 Build leadershipM2 · INSTALLED AND CABLED Delivery program and reporting 03 Burn-in M3 · BURN-IN COMPLETE Stable cluster through burn-in 04 Acceptance M4 · CUSTOMER ACCEPTANCE Completed acceptance 05 Workload-ready handoverM5 · PRODUCTION LIVE Handover pack and runbooks CAPACITY SIGNED 01 Readiness and design validation Validated design M1 · DESIGN FREEZE 02 Build leadership Delivery program and reporting M2 · INSTALLED AND CABLED 03 Burn-in Stable cluster through burn-in M3 · BURN-IN COMPLETE 04 Acceptance Completed acceptance M4 · CUSTOMER ACCEPTANCE 05 Workload-ready handover Handover pack and runbooks M5 · PRODUCTION LIVE

04 / TRACK RECORD

Built at gigawatt scale, across four US metros.

1.2 GW
total site capacity across the four metros
18%
faster delivery than industry standard
300 MW
largest single site
4
generations of ML chips deployed
3
years in hyperscale delivery

05 / PLAYBOOK

AI Cluster Delivery Playbook COMING SOON
The phase-by-phase plan we use to take a cluster from signed capacity to production.

06 / NEXT STEP

Tell us where your build is. We'll tell you what comes next.