APPROACH

How we deliver.

We lead the whole build, from design review to production workloads. Each phase ends with a milestone you can report to your board, investors and lenders.

01 / THE FIVE PHASES
CAPACITY SIGNED 01 Readiness and design validationM1 · DESIGN FREEZE Validated design 02 Build leadershipM2 · INSTALLED AND CABLED Delivery program and reporting 03 Burn-in M3 · BURN-IN COMPLETE Stable cluster through burn-in 04 Acceptance M4 · CUSTOMER ACCEPTANCE Completed acceptance 05 Workload-ready handoverM5 · PRODUCTION LIVE Handover pack and runbooks CAPACITY SIGNED 01 Readiness and design validation Validated design M1 · DESIGN FREEZE 02 Build leadership Delivery program and reporting M2 · INSTALLED AND CABLED 03 Burn-in Stable cluster through burn-in M3 · BURN-IN COMPLETE 04 Acceptance Completed acceptance M4 · CUSTOMER ACCEPTANCE 05 Workload-ready handover Handover pack and runbooks M5 · PRODUCTION LIVE
01

Readiness and design validation

WHAT WE LEAD

Design review of the cluster, fabric, power and cooling. Site readiness against the delivery date. Vendor scopes and the interfaces between them.

WHAT YOU GET

A validated design and a delivery plan tied to your financing milestones.

CLOSES WITHM1 · Design freeze

Design, bill of materials and schedule agreed.

02

Build leadership

WHAT WE LEAD

Program management across vendors and contractors. Installation, cabling and power-on. Daily issue resolution on site.

WHAT YOU GET

A delivery program with regular reporting you can share with investors and lenders.

CLOSES WITHM2 · Installed and cabled

All racks installed, cabled to the rail map and powered.

03

Burn-in

WHAT WE LEAD

Fabric bring-up. Sustained stress testing of compute, memory and network. Fault isolation and vendor replacements.

WHAT YOU GET

A stable cluster through burn-in, with a record of every fault and fix.

CLOSES WITHM3 · Burn-in complete

Agreed thresholds held under sustained load.

04

Acceptance

WHAT WE LEAD

An acceptance plan agreed up front. Running the tests against the contract. Closing out any gaps with vendors.

WHAT YOU GET

A completed acceptance.

CLOSES WITHM4 · Customer acceptance

Contract acceptance criteria met.

05

Workload-ready handover

WHAT WE LEAD

Onboarding the first production workloads. Runbooks and escalation paths. Handover to your operations team.

WHAT YOU GET

A handover pack with runbooks, as-built records and a list of open items.

CLOSES WITHM5 · Production live

First production workloads running.

02 / ENGAGEMENTS

Four ways to work with us.

  1. 1

    Deployment rescue

    We step in and take over a build that is behind schedule or failing, then bring it to a date we can commit to.

    FITS WHENYou are in build or commissioning and the dates are slipping.
  2. 2

    Full delivery program

    We lead the program from signing to handover, across every phase and every vendor.

    FITS WHENCapacity is signed and the build has not started.
  3. 3

    Embedded deployment office

    Our people run delivery inside your team, alongside your staff and vendors.

    FITS WHENYou have an infrastructure team and want delivery leadership inside it.
  4. 4

    Pre-signing design and contract support

    We shape the design and scope before you commit, so the contract matches what can be delivered.

    FITS WHENYou are negotiating capacity, hardware or build contracts.